Although the operating characteristics shop is not necessarily gold lots, However, we should choose the relatively large flow of the second-class waiting convenient lots. But quiet, elegant environment. addressable, can observe for a period of time. In addition, more, based on its own strength positioning.
1. identification of the product, order a duplicate. Companies will do reunification matrix;
2. Product orders to determine the future, you need to advance deposit (40% down payment, the shipper may pay 60%);
3. After the company received the deposit unified production, Unity Garments Ration, a month after the shipment arrangements. In the meantime, You can precisely arranged storefront decoration, and personnel training.
4. Consignor ago (you can to inspection), or notify the sender (freight payment, your charge);
5. goods in the sales process, customer orders, the advance notice required to build the company set aside to build and the time of delivery; on the retreat, a replacement, grading REFUND initial intention to be back on. Finally, we would like to say : opportunities for everyone to be equal, it becomes dream or into a reality you see all the action. We look forward to working jointly to create our glorious cause.